Level C· Early human research exploring benefitsProspective StudyPubMedOpen access

Optimizing adipose-derived stromal vascular fraction storage: Temperature and time impact on cell viability in regenerative medicine.

Jović D., Preradović L., Jović F., Kremenović M., Lukić D., Antonić M.

Prospective Study with a reported sample of 43 on Immune Modulation, published in Medicine (Baltimore) (2024) — summary generated from the PubMed abstract.

Open my reading list
Level C· Early human research exploring benefitsEvidence level of this study

Early human evidence such as case series or small samples is exploring possible benefits.

  • Level A · Stronger Clinical Evidence
  • Level B · Emerging clinical evidence with positive signals
  • Level C · Early human research exploring benefits
  • Level D · Scientific groundwork from lab and animal studies
  • Emerging · Emerging topic under active research
Read the A–D evidence level guide

This page is generated from the PubMed record. The Thai description is an automated summary of bibliographic fields and the abstract, not a full translation, and is not medical advice.

Study type
Prospective Study
Journal
Medicine (Baltimore) (2024)
Country
United States
Reported sample size
43
Source database
PubMed
PMID
39312305
PMCID
PMC11419534
DOI
10.1097/MD.0000000000039859
Citations
4

Abstract (original English)

Background The adipose-derived stromal vascular fraction (SVF) plays a crucial role in regenerative medicine owing to its regenerative and immunomodulatory properties. However, the effective utilization of SVF in therapeutic applications requires careful consideration of storage conditions to maintain cell viability. Methods We conducted a research on 43 patients of different ages and sexes who were older than 18 years. This study explored the impact of different temperatures (-80, -20, and 4 °C) on SVF storage in platelet-poor plasma for 1 and 6 months. SVF extracted using a semi-UNISTATION™ system was subjected to rigorous analysis of cell count and viability using a LUNA-STEM™ Dual Fluorescence Cell Counter. Results The results indicated a significant correlation between the storage conditions and SVF viability. Notably, storing SVF at 4 °C demonstrated the highest cell viability and count, while -80 °C storage exhibited the least favorable outcomes. This study emphasizes the importance of minimizing storage time to preserve SVF viability, as evidenced by a decline in both cell count and viability over a 6-month period. Comparisons with the existing literature underscore the need for precise protocols for SVF storage, with considerations for temperature and cryoprotective agents. These findings provide valuable insights for developing optimal SVF storage protocols to enhance

What this study does not prove

  • • This study does not prove SVF is an approved treatment or a replacement for standard care.

Evidence level

Early human evidence such as case series or small samples is exploring possible benefits.

How we grade evidence
HumansCell SurvivalRegenerative MedicineFemaleMaleMiddle AgedAdultAdipose TissueStromal Vascular FractionTemperature

Browse all related research

Filter the research library by this study's title keywords, author, or publication year.

Related research